Bicycle infrastructure drafting · Greenwich, CT

hand us the curb line. we’ll draw the lane.

Permit-ready bike lane, bike parking and end-of-trip drawings for developers, small municipalities and property managers — priced per drawing set, and quoted before we open a file.

  • Open daily, 8am–4pm
  • DWG + plot-ready PDF delivered
  • First round of review comments included
sheet 01 · permit-ready A cyclist rides a freshly marked buffered bike lane past new bike racks on a sunlit street
5′-0″ bike lane 3′-0″ buffer

How a set gets made

one number to remember: five.

The rest of the engagement is deliberately dull. One scope, one price, one set of sheets — and a calendar you can read from across the room.

per set, never per hour

The figure you approve is the figure on the invoice. Scope grows only when you ask it to, in an email we both keep.

Five business days, base sheet in to drawing set out, for a standard bike parking set

one revision round, built in

Your reviewer’s first round of comments is on us. After that it’s $185 a sheet, and we’ll tell you the count before we start.

Most bicycle infrastructure fails in the paperwork, not the paint. A rack two inches too close to a wall, a buffer without a dimension, a shower core without a turning circle — each one buys a comment letter, and each comment letter buys a month. We draw the dull details first so the exciting ones survive review.

We work for developers who need a bike room on a site plan by Friday, for small-town public works offices that have a grant and no CAD seat, and for property managers turning a loading dock into a place a person can shower before nine o’clock.

Every set is checked twice: once on screen, once plotted at 24×36 and read on paper with a red pen, the way your reviewer will read it.

“a reviewer should never have to ask what a line means.”

— house rule, the drafting desk

the week of a standard set

  • day 1We read your base sheet, confirm scope and fix the sheet count.
  • day 2Linework: racks, lane edges, curb lines, clearances.
  • day 3Dimensions and notes, then a pass against your jurisdiction’s checklist.
  • day 4Internal check, plotted and read on paper.
  • day 5DWG and PDF land in your inbox; the revision round opens.

Before you hand over a site plan

two ways a drawing set arrives

Same lane, same rack, same reviewer. The difference is whether the set answers the obvious questions or leaves them for the comment letter.

rev. 0 · red-lined

the set that comes back marked up

  • Stall spacing implied, never dimensioned.
  • Buffer width scaled off a PDF by the reviewer.
  • Shower rooms drawn without a clear turning circle.
  • General notes pasted in from a different town’s checklist.
  • A DWG whose layers nobody else can open.
the merid velo set

the set that goes straight to the stack

  • Every stall, aisle and clearance dimensioned in feet and inches.
  • Lane widths, buffers and tapers called out at every section cut.
  • Notes written to the checklist your reviewer actually uses.
  • Named layers in a clean DWG, plus a plot-ready PDF.
  • A cover sheet and sheet index, so nothing has to be hunted for.

the questions people ask first

Do you stamp or seal the drawings?

No. We draft. Where your jurisdiction needs a seal, your engineer or architect of record applies it — we format the set for them and work straight from their markups.

How is a set priced?

Per set, quoted before work starts. A set is a bundle of sheets for one scope — see the figures below. Extra revisions after the included round are $185 a sheet.

What do you need to begin?

A base: survey, site plan or architect’s floor plan in DWG or PDF. A reviewer’s checklist helps; if you don’t have one, we’ll hand you the three questions to put to the planning office.

Which design manuals do you draw to?

Whichever your reviewer cites. Most often that’s the NACTO and AASHTO bike guides and the APBP bike parking guidelines, with local standards layered over the top.

Can you hit a hearing or grant deadline?

Rush sets turn in two business days for +35%. Tell us the date in your first message and we’ll say yes or no before the day is out.

How do I pay?

We invoice when the set is delivered. Card, ACH or check are all fine.

What a set costs

four figures, in plain sight

Fixed per set, per scope. Corridors, campuses and multi-phase jobs are quoted by email the same day we see the base sheet.

5-day turn $690
bike parking set

Up to four sheets for a rack or corral layout that clears review.

  • Rack layout plan
  • Mounting & clearance details
  • Signage notes
Start this set
up to 1,000 ft $1,485
bike lane segment

Up to eight sheets for a painted, buffered or protected lane.

  • Plan & profile
  • Typical sections
  • Striping, signing & tapers
Start this set
showers incl. $2,260
end-of-trip facility

Six to nine sheets for a bike room that people actually use.

  • Secure bike room & lockers
  • Showers, repair stand
  • Clearances & finishes
Start this set
after round one $185
extra revision, per sheet

Reviewer wants another pass? We turn it in two business days.

  • Rush set: +35%
  • Larger scopes: by quote
Request a quote

Prices in US dollars, invoiced on delivery. Card, ACH or check.

From the plotter

sheets we’d be happy to pin up

Illustrative sheets drawn to show our standard of detail: the dimension strings, the clearances, the index that keeps a reviewer oriented.

sheet p-101
Inverted-U bike racks in front of a modern office building
Surface bike parkingTwelve stalls, 30″ on centre, 5′ aisle.
sheet index

an end-of-trip set, sheet by sheet

  1. C-001Cover, index & general notes
  2. C-101Bike room layout plan
  3. C-102Lockers & shower plan
  4. C-201Sections & elevations
  5. C-301Rack & mounting details
  6. C-401Signage & wayfinding
section a–a TYPICAL SECTION A–A 5′-0″3′11′-0″ N
Buffered lane, typical sectionDimensioned at every cut, not just the first.

“a rack that fits on paper and not on the sidewalk isn’t a rack. it’s a rumour.”

— overheard at the plotter
detail c-301 RACK LAYOUT — PLAN 5′-0″ MIN. CLEAR AISLE 2′-6″ O.C. SCALE 1/4″ = 1′
Rack layout detailStall envelopes drawn, not implied.
ada clear
A bright secure bike room with lockers and a repair stand
Secure bike roomLockers, repair stand and a turning circle that works.

Ready to start?

send the site plan. get a fixed price back today.

Tell us what you’re drawing and where it’s going for review. We’ll reply during the day with a set price, a sheet count and a delivery date — all Greenwich desk hours, 8am to 4pm, every day of the week.

attach these

what to put in the first message

  • Your base: survey, site plan or floor plan (DWG or PDF).
  • The reviewer’s checklist or the code section that sets bike parking minimums.
  • Your submission date, or the hearing it’s aimed at.
  • The name of your engineer or architect of record, if you have one.
  • A photo of the curb or the corner it’s going in. Phone pictures are fine.

write to the drafting desk

Files too big for email? Say so and we’ll send a transfer link.

the drafting desk

Address

11 Gard Ct
Greenwich, CT 06831

Hours

Daily 8am–4pm

11 Gard Ct, Greenwich, CT Find the desk on the map